Difference between revisions of "Rust Computer Center"

From Bhamwiki
Jump to: navigation, search
(added photo)
 
Line 5: Line 5:
 
* {{Fisher-1995}}
 
* {{Fisher-1995}}
  
 +
[[Category:Data centers]]
 
[[Category:1969 buildings]]
 
[[Category:1969 buildings]]
 
[[Category:UAB buildings]]
 
[[Category:UAB buildings]]
 
[[Category:18th Street South]]
 
[[Category:18th Street South]]
 
[[Category:University Boulevard]]
 
[[Category:University Boulevard]]

Latest revision as of 09:07, 12 July 2019

Rust Computer Center in 2018

The Rust Computer Center is a three-story building located at 815 18th Street South on the UAB Campus. A groundbreaking ceremony was held on March 6, 1968 and the building was completed in 1969. It has office space and a data center on the top floor and a parking garage on the lower floors. The bottom floor of the parking garage is designated as Parking Lot 3 and the first floor of the parking garage is designated as Parking Lot 2.

References