The Alabaster Domed Stadium was a proposed facility for a multi-use domed stadium to be built in an abandoned Alabaster limestone quarry. First proposed in March 1995, its initial costs were estimated to be $48 million for physical construction excluding the purchase of land where the facility and parking would be constructed. Later estimates would increase its costs to between would cost between $100 million and $150 million for construction. The feasibility of constructing the facility would be handled by the Alabaster Stadium Advisory Committee.

The proposal called for a 480,000-square-foot stadium with a minimum of 50,400 seats with future expansion bringing its capacity to 84,000. In order to make the facility economically viable, the city was looking to the Birmingham Barracudas and both the University of Alabama and UAB football programs to serve as potential tenants of the facility. This proposal would stall by early summer and fail to gain any further steam as the site originally proposed for the facility became unavailable.

References

  • Anderson, Jon. (March 30, 1995) "Punt, pass or blast; Alabaster quarry could be domed stadium." Birmingham News.
  • Anderson, Jon. (April 30, 1995) "Quarry-into-stadium plan hits stone wall." Birmingham News.