Maiden Heights: Difference between revisions
Jump to navigation
Jump to search
(Created page with "'''Maiden Heights''' is an 11-home residential subdivision being developed by Allan Worthington and Red Street Investment Co. on a former surface parking lot at 1235 [...") |
No edit summary |
||
Line 1: | Line 1: | ||
'''Maiden Heights''' is an 11-home residential subdivision being developed by [[Allan Worthington]] and [[Red Street Investment Co.]] on a former surface parking lot at 1235 [[23rd Street South]], the [[Highland Park]] section of which was formerly known as "Maiden Street". | '''Maiden Heights''' is an 11-home residential subdivision being developed by [[Allan Worthington]] and [[Red Street Investment Co.]] on a former surface parking lot at 1235 [[23rd Street South]], the [[Highland Park]] section of which was formerly known as "Maiden Street". | ||
[[Barrett Architecture Studio]] designed the three house types, including a bronwstone-inspired rowhouse. [[Murray Construction]] is building the development, which | [[Barrett Architecture Studio]] designed the three house types, including a bronwstone-inspired rowhouse. [[Murray Construction]] is building the development, which was completed in spring [[2024]]. | ||
==References== | ==References== | ||
* Parker, Illyshia (July 20, 2022) "Million-dollar single-family community to break ground in Highland Park." {{BBJ}} | * Parker, Illyshia (July 20, 2022) "Million-dollar single-family community to break ground in Highland Park." {{BBJ}} | ||
* Parker, Illyshia (April 8, 2024) "Highland Park luxury project nearing completion." {{BBJ}} | |||
[[Category:23rd Street South]] | [[Category:23rd Street South]] | ||
[[Category: | [[Category:2024 buildings]] | ||
[[Category:Barrett Architecture Studio buildings]] | [[Category:Barrett Architecture Studio buildings]] |
Latest revision as of 11:05, 9 April 2024
Maiden Heights is an 11-home residential subdivision being developed by Allan Worthington and Red Street Investment Co. on a former surface parking lot at 1235 23rd Street South, the Highland Park section of which was formerly known as "Maiden Street".
Barrett Architecture Studio designed the three house types, including a bronwstone-inspired rowhouse. Murray Construction is building the development, which was completed in spring 2024.
References
- Parker, Illyshia (July 20, 2022) "Million-dollar single-family community to break ground in Highland Park." Birmingham Business Journal
- Parker, Illyshia (April 8, 2024) "Highland Park luxury project nearing completion." Birmingham Business Journal