Rust Computer Center: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
(updated text and links)
mNo edit summary
Line 1: Line 1:
'''Rust Computer Center''' is a three-story building located at 815 [[18th Street South]] on the [[UAB Campus]]. A groundbreaking ceremony was held on March 6, 1968 and the building was completed in 1969. It has office space and a data center on the top floor and a parking garage on the lower floors. The bottom floor of the parking garage is designated as [[UAB Parking Lot 3|Parking Lot 3]] and the first floor of the parking garage is designated as [[UAB Parking Lot 2|Parking Lot 2]].  
The '''Rust Computer Center''' is a three-story building located at 815 [[18th Street South]] on the [[UAB Campus]]. A groundbreaking ceremony was held on March 6, 1968 and the building was completed in 1969. It has office space and a data center on the top floor and a parking garage on the lower floors. The bottom floor of the parking garage is designated as [[UAB Parking Lot 3|Parking Lot 3]] and the first floor of the parking garage is designated as [[UAB Parking Lot 2|Parking Lot 2]].  


{{stub}}
{{stub}}

Revision as of 16:30, 20 September 2017

The Rust Computer Center is a three-story building located at 815 18th Street South on the UAB Campus. A groundbreaking ceremony was held on March 6, 1968 and the building was completed in 1969. It has office space and a data center on the top floor and a parking garage on the lower floors. The bottom floor of the parking garage is designated as Parking Lot 3 and the first floor of the parking garage is designated as Parking Lot 2.

References

  • Fisher, Virginia E. (1995) Building on a Vision. Birmingham, Alabama: Crane Hill Publishers ISBN 1881548147