Trussville Civic Center: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
(it is under construction as we speak)
Line 1: Line 1:
The '''New Trussville Community Center''' is proposed for a site along [[Trussville-Clay Road]] adjacent to the proposed new [[Hewitt-Trussville High School]]. The 67,500 square foot, $10 million, one-story structure would replace the [[John C. Yarbrough Community Center]] on [[Parkway Drive Trussville|Parkway Drive]].  
The '''New Trussville Community Center''' is being built on [[Trussville-Clay Road]] adjacent to the proposed new [[Hewitt-Trussville High School]]. The 67,500 square foot, $10 million, one-story structure will replace the [[John C. Yarbrough Community Center]] on [[Parkway Drive Trussville|Parkway Drive]].  


Proposed for completion in either late [[2007]] or early [[2008]], the center will feature an exhibition hall, a full-sized kitchen and several meeting rooms. Designed by [[Davis Architects]], its architecture will compliment that of the neighboring new [[Hewitt-Trussville High School]].  
Slated for completion in [[2008]], the center will feature an exhibition hall, a full-sized kitchen and several meeting rooms. Designed by [[Davis Architects]], its architecture will compliment that of the neighboring new [[Hewitt-Trussville High School]].  


On Tuesday, November 14, 2006, the Trussville City Council unanimously rezoned the parcels at 5460 [[Trussville-Clay Road]] from one institutional zoning to a more appropriate one to allow for the construction of the new building.
On Tuesday, [[November 14]], [[2006]], the Trussville City Council unanimously rezoned the parcels at 5460 [[Trussville-Clay Road]] from one institutional zoning to a more appropriate one to allow for the construction of the new building.


==References==
==References==

Revision as of 12:10, 15 January 2008

The New Trussville Community Center is being built on Trussville-Clay Road adjacent to the proposed new Hewitt-Trussville High School. The 67,500 square foot, $10 million, one-story structure will replace the John C. Yarbrough Community Center on Parkway Drive.

Slated for completion in 2008, the center will feature an exhibition hall, a full-sized kitchen and several meeting rooms. Designed by Davis Architects, its architecture will compliment that of the neighboring new Hewitt-Trussville High School.

On Tuesday, November 14, 2006, the Trussville City Council unanimously rezoned the parcels at 5460 Trussville-Clay Road from one institutional zoning to a more appropriate one to allow for the construction of the new building.

References

  • Debro, Anita (June 7, 2006) "Community center design to match nearby buildings". Birmingham News.
  • Debro, Anita (November 16, 2006) "Government roundup". Birmingham News.