24th Street Viaduct: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 7: | Line 7: | ||
[[Category:1926 buildings]] | [[Category:1926 buildings]] | ||
[[Category:24th Street North|0]] | |||
[[Category:24th Street South|0]] | |||
[[Category:Bridges]] | [[Category:Bridges]] |
Revision as of 14:27, 22 October 2006
The 24th Street Viaduct is a road bridge connecting 24th Street South to 24th Street North over the Railroad Reservation. Construction began on June 1, 1925 and was completed in early 1926. The cost was $330,000.
References
- Birmingham Chamber of Commerce (May 1925) "Industrial Activities", Birmingham Vol. 1, No. 2