The '''Clay Community Center''' is located in [[Clay]] on [[Clay-Palmerdale Road]]. The center was completed in August [[2006]] to serve as a replacement for an aging center demolished to make way for the new center.  
The '''Clay Community Center''' is located in [[Clay]] at 6411 [[Clay-Palmerdale Road]], adjacent to the [[Center Point Fire District Station 4]]. The center was completed in August [[2006]] to serve as a replacement for an aging center demolished to make way for the new center.  


Designed by [[Thompson Architecture]] and constructed by [[B&B Construction]], the 4,400 square foot building took six months to complete at a cost of $437,000. The center features a large meeting room, two handicapped accessible restrooms, a small kitchen area and a storage room. The center is available for both public and private functions.
Designed by [[Thompson Architecture]] and constructed by [[B&B Construction]], the 4,400 square foot building took six months to complete at a cost of $437,000. The center features a large meeting room, two handicapped accessible restrooms, a small kitchen area and a storage room. The center is available for both public and private functions.


The center was formally opened to the public on Monday, September 11, 2006, at 6:30 p.m. for an open house.
The center was formally opened to the public on [[September 11]], 2006.


==References==
==References==
Line 10: Line 10:
[[Category:Clay]]
[[Category:Clay]]
[[Category:2006 buildings]]
[[Category:2006 buildings]]
[[Category:Clay-Palmerdale Road]]

Revision as of 16:25, 13 March 2008

The Clay Community Center is located in Clay at 6411 Clay-Palmerdale Road, adjacent to the Center Point Fire District Station 4. The center was completed in August 2006 to serve as a replacement for an aging center demolished to make way for the new center.

Designed by Thompson Architecture and constructed by B&B Construction, the 4,400 square foot building took six months to complete at a cost of $437,000. The center features a large meeting room, two handicapped accessible restrooms, a small kitchen area and a storage room. The center is available for both public and private functions.

The center was formally opened to the public on September 11, 2006.

References

  • Debro, Anita (September 06, 2006) "Clay schedules open house for new community center". Birmingham News.