Inglenook K-8 School: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 23: Line 23:


The new two-story brick addition was constructed in [[1950]] at a cost of $132,303. The work included four new classrooms, an auditorium, expansion of the lunchroom, and replacement of the school's heating plant. In [[1953]] another addition, completed for $153,000, funded from [[1952 Birmingham bonds|a special bond issue]], replaced the original building and added eight classrooms and a gymnasium. At the community's recommendation, the gymnasium took the place of vocational shops which had originally been planned. A new cafeteria was added in [[1960]]. Funds from a [[1965 Birmingham bonds|1965 bond issue]] provided new fencing around the school property. Another construction project under development in [[1969]] was allowed to move forward by federal courts because it would allow for the integration of students from the formerly all-Black [[Dudley School]], which was converted into a model kindergarten.
The new two-story brick addition was constructed in [[1950]] at a cost of $132,303. The work included four new classrooms, an auditorium, expansion of the lunchroom, and replacement of the school's heating plant. In [[1953]] another addition, completed for $153,000, funded from [[1952 Birmingham bonds|a special bond issue]], replaced the original building and added eight classrooms and a gymnasium. At the community's recommendation, the gymnasium took the place of vocational shops which had originally been planned. A new cafeteria was added in [[1960]]. Funds from a [[1965 Birmingham bonds|1965 bond issue]] provided new fencing around the school property. Another construction project under development in [[1969]] was allowed to move forward by federal courts because it would allow for the integration of students from the formerly all-Black [[Dudley School]], which was converted into a model kindergarten.
Another addition in [[2007]] included a new competition gymnasium along with three classrooms and a science lab.


==Principals==
==Principals==
* [[Odell Grady]], 1957-
* [[W. K. Norton]], 1930
* [[J. Paul Hanlin]], 1937
* [[H. Claxton Sparks]], –1949
* [[Roy Shelton]], 1950–1957
* [[Odell Grady]], 1957–
* [[Willow Martin]], 1966–1967
* [[Donna Mitchell]], 2000–2013
* [[Mario Lumzy]], current
* [[Mario Lumzy]], current



Latest revision as of 19:09, 22 January 2024

Inglenook K-8 School
BCS small logo.png Birmingham City Schools
Years [[]]–present
Location 4120 Inglenook Street, (map)
Inglenook neighborhood
Grades K-8
Principal Mario Lumzy
Enrollment 382 (2012)
Colors purple & black
Mascot Panthers
Website bcs.schoolwires.net

Inglenook K-8 School is a K-8 school in the Birmingham City Schools system located at 4120 Inglenook Street in the Inglenook neighborhood.

In the 1940s, Inglenook School served African-American students only, but it was replaced by a white school.

The new two-story brick addition was constructed in 1950 at a cost of $132,303. The work included four new classrooms, an auditorium, expansion of the lunchroom, and replacement of the school's heating plant. In 1953 another addition, completed for $153,000, funded from a special bond issue, replaced the original building and added eight classrooms and a gymnasium. At the community's recommendation, the gymnasium took the place of vocational shops which had originally been planned. A new cafeteria was added in 1960. Funds from a 1965 bond issue provided new fencing around the school property. Another construction project under development in 1969 was allowed to move forward by federal courts because it would allow for the integration of students from the formerly all-Black Dudley School, which was converted into a model kindergarten.

Another addition in 2007 included a new competition gymnasium along with three classrooms and a science lab.

Principals