Railroad Avenue (Trussville): Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
'''Railroad Avenue (Trussville)''' is an east-west commercial street in [[Trussville]]. The road runs parallel with [[Main Street (Trussville)]] beginning in the west at [[Chalkville Road]] and continuing north-east until terminating at [[Trussville City Hall]].
'''Railroad Avenue (Trussville)''' is an east-west commercial street in [[Trussville]]. The approximately one-quarter mile long road runs parallel with [[Main Street (Trussville)]] beginning in the west at [[Chalkville Road]] and continuing north-east until terminating at [[Trussville City Hall]].


The road, which previously ended after a block at [[Cedar Street]], was extended to the City Hall property in [[2015]] in an attempt to alleviate traffic backups at the Chalkville Road and Main Street intersection, and improve drainage to help with flooding which had long been an issue in the area.  
The road, which previously ended after a block at [[Cedar Street]], was extended to the City Hall property in [[2015]] in an attempt to alleviate traffic backups at the Chalkville Road and Main Street intersection, and improve drainage to help with flooding which had long been an issue in the area.  
Line 8: Line 8:
* [[Cedar Street]] intersection
* [[Cedar Street]] intersection
** 111: [[Whistle Stop Garden Shop]]
** 111: [[Whistle Stop Garden Shop]]
** 139: [[Crossfit Trussville]]
** [[Crossfit Trussville]] (139 Railroad Street)
* [[Railroad Street]] intersection
* [[Railroad Street]] intersection
** [[Bryant Bank]] parking lot
** [[Bryant Bank]] parking lot
Line 17: Line 17:


[[Category:Railroad Avenue Trussville|*]]
[[Category:Railroad Avenue Trussville|*]]
[[Category:2015 works]]

Latest revision as of 10:28, 25 January 2021

Railroad Avenue (Trussville) is an east-west commercial street in Trussville. The approximately one-quarter mile long road runs parallel with Main Street (Trussville) beginning in the west at Chalkville Road and continuing north-east until terminating at Trussville City Hall.

The road, which previously ended after a block at Cedar Street, was extended to the City Hall property in 2015 in an attempt to alleviate traffic backups at the Chalkville Road and Main Street intersection, and improve drainage to help with flooding which had long been an issue in the area.

References

  • Lloyd, Gary (April 22, 2015) "Railroad Avenue could be complete by September." Trussville Tribune