Rust Computer Center: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
(added photo) |
||
Line 1: | Line 1: | ||
The '''Rust Computer Center''' is a three-story building located at 815 [[18th Street South]] on the [[UAB Campus]]. A groundbreaking ceremony was held on March 6, 1968 and the building was completed in 1969. It has office space and a data center on the top floor and a parking garage on the lower floors. The bottom floor of the parking garage is designated as [[UAB Parking Lot 3|Parking Lot 3]] and the first floor of the parking garage is designated as [[UAB Parking Lot 2|Parking Lot 2]]. | [[Image:Rust_Computer_Center.jpg|right|thumb|350px|Rust Computer Center in 2018]] | ||
The '''Rust Computer Center''' is a three-story building located at 815 [[18th Street South]] on the [[UAB Campus]]. A groundbreaking ceremony was held on March 6, 1968 and the building was completed in [[1969]]. It has office space and a data center on the top floor and a parking garage on the lower floors. The bottom floor of the parking garage is designated as [[UAB Parking Lot 3|Parking Lot 3]] and the first floor of the parking garage is designated as [[UAB Parking Lot 2|Parking Lot 2]]. | |||
==References== | ==References== |
Revision as of 21:13, 9 February 2018
The Rust Computer Center is a three-story building located at 815 18th Street South on the UAB Campus. A groundbreaking ceremony was held on March 6, 1968 and the building was completed in 1969. It has office space and a data center on the top floor and a parking garage on the lower floors. The bottom floor of the parking garage is designated as Parking Lot 3 and the first floor of the parking garage is designated as Parking Lot 2.
References
- Fisher, Virginia E. (1995) Building on a Vision. Birmingham, Alabama: Crane Hill Publishers ISBN 1881548147