Don Drennen Overpass: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
mNo edit summary
No edit summary
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[Image:Don Drennen Overpass.jpg|right|thumb|300px|Don Drennen Overpass in May 2006.]]
[[File:1957 Don Drennen overpass aerial.jpg|thumb|center|800px|Aerial view of the Don Drennen Overpass in 1957]]
The '''Don Drennen Overpass''' or '''Ensley viaduct''' is a 1,590 foot long, steel-span viaduct over the [[Birmingham Southern Railroad Yard]] in the [[Ensley]] community of northwest [[Birmingham]]. Opening to traffic in [[1954]], the bridge was designed and built by [[W.C. Howton Contracting]], and bisects the abandoned [[TCI Ensley Works|Ensley Works]]. Currently the bridge carries traffic for [[Alabama State Highway 269]].


The '''Don Drennen Overpass''' or '''Ensley viaduct''' is a 1,590 foot long, steel-span viaduct over the [[Birmingham Southern Railroad Yard]] in the [[Ensley]] community of northwest [[Birmingham]]. It bisects the now abandoned [[Ensley Works|TCI Ensley Works]] and currently carries traffic for [[Alabama State Highway 269]].
[[Image:Don Drennen Overpass.jpg|right|thumb|275px|Don Drennen Overpass in May 2006.]]
The bridge angles from [[20th Street Ensley]] across the tracks to [[Sherman Heights]]. The elevated road deck is 1,590 feet long, while the approaches bring the total project length to 2,826 feet.
Construction was divided into three phases: preparation of approach ramps and abutments, installation of the steel bridge structure, and pouring of the concrete bridge deck. [[W. C. Howton Contracting]] won the bids for design and construction of the $1 million overpass. The first phase was completed in May [[1952]], with the bridge opening to traffic in [[1954]].
{{stub}}
==References==
==References==
* Whittington, George (May 16, 1952) "[http://www.birminghamrewound.com/features/Ensley%20(05-52).jpg Avenue F underpass may open in two weeks; bids opened for Ensley project]" {{BN}} - via [[Birmingham Rewound]]
* Baker, Jerry (February 21, 2001) "Contractor built bridge to last." {{BN}}
==External links==
{{Locate | lat=33.515515 | lon=-86.902291 | zoom=16 }}
{{Locate | lat=33.515515 | lon=-86.902291 | zoom=16 }}
* Baker, Jerry (February 21, 2001) "Contractor built bridge to last." ''Birmingham News''.


{{stub}}
[[Category:Bridges]]
[[Category:Bridges]]
[[Category:1954 buildings]]
[[Category:1954 buildings]]
Line 12: Line 21:
[[Category:Ensley]]
[[Category:Ensley]]
[[Category:Alabama State Highway 269]]
[[Category:Alabama State Highway 269]]
[[Category:20th Street Ensley]]

Latest revision as of 09:57, 15 September 2019

Aerial view of the Don Drennen Overpass in 1957

The Don Drennen Overpass or Ensley viaduct is a 1,590 foot long, steel-span viaduct over the Birmingham Southern Railroad Yard in the Ensley community of northwest Birmingham. It bisects the now abandoned TCI Ensley Works and currently carries traffic for Alabama State Highway 269.

Don Drennen Overpass in May 2006.

The bridge angles from 20th Street Ensley across the tracks to Sherman Heights. The elevated road deck is 1,590 feet long, while the approaches bring the total project length to 2,826 feet.

Construction was divided into three phases: preparation of approach ramps and abutments, installation of the steel bridge structure, and pouring of the concrete bridge deck. W. C. Howton Contracting won the bids for design and construction of the $1 million overpass. The first phase was completed in May 1952, with the bridge opening to traffic in 1954.

References