UAB Intramural and Club Sport Field Complex: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
UAB’s '''Intramural and Club Sport Field Complex''' is located at 1101 [[5th Avenue South]]. It is a joint project between [[UAB Student Affairs]] and [[UAB Campus Recreation]] through the [[UAB Facilities Division]]. Campus Recreation will oversee the fields, programming and scheduling. The groundbreaking ceremony was on October 12, 2017 and the grand opening ceremony for the complex was held on August 29, 2018.
UAB’s '''Intramural and Club Sport Field Complex''' is located at 1101 [[5th Avenue South]]. It is a joint project between [[UAB Student Affairs]] and [[UAB Campus Recreation]] through the [[UAB Facilities Division]]. Campus Recreation will oversee the fields, programming and scheduling. The groundbreaking ceremony was on October 12, 2017 and the grand opening ceremony for the complex was held on [[August 29]], [[2018]].


The fields feature lights, scoreboards, a water-bottle-filling station, fountains and storage for the fields. Two games can be played simultaneously, and the fields will be strategically rotated, so the grass does not wear away as quickly.
The fields feature lights, scoreboards, a water-bottle-filling station, fountains and storage for the fields. Two games can be played simultaneously, and the fields will be strategically rotated, so the grass does not wear away as quickly.
Line 13: Line 13:
[[Category:5th Avenue South]]
[[Category:5th Avenue South]]
[[Category:11th Street South]]
[[Category:11th Street South]]
[[Category:2018 buildings]]

Revision as of 10:26, 20 July 2018

UAB’s Intramural and Club Sport Field Complex is located at 1101 5th Avenue South. It is a joint project between UAB Student Affairs and UAB Campus Recreation through the UAB Facilities Division. Campus Recreation will oversee the fields, programming and scheduling. The groundbreaking ceremony was on October 12, 2017 and the grand opening ceremony for the complex was held on August 29, 2018.

The fields feature lights, scoreboards, a water-bottle-filling station, fountains and storage for the fields. Two games can be played simultaneously, and the fields will be strategically rotated, so the grass does not wear away as quickly.

The architect was Holcombe Norton Partners and it was built by Sports Turf Company.

References

  • Thomason, Shannon (October 10, 2017) "New intramural fields coming to UAB" UAB News