'''Green Drive''' is an approximately one-half mile road in [[Trussville]] and serves as a link from the business district near the [[Interstate 59]] [[Chalkville Road]] exit to [[Trussville-Clay Road]].  The road leads north from Chalkville Road, then turns east just before intersecting the interstate.
'''Green Drive''' is an approximately one-half mile road in [[Trussville]] and serves as a link from the business district near the [[Interstate 59]] [[Chalkville Road]] exit to [[Trussville-Clay Road]].  The road leads north from Chalkville Road, then turns east just before intersecting the interstate. The entire eastern portion of the road is occupied by the [[Trussville Wastewater Treatment Plant]] and surrounding land owned by the [[Jefferson County Sewer System]].


In May [[2013]] a culvert collapsed on the road causing it to be shut down between [[Norrell Drive]] and [[Trussville-Clay Road]]. In September, the contract for construction was awarded to [[Bob Smith Construction]], with the engineering construction awarded to [[Schoel Engineering]]. Construction was completed by December and the road reopened on [[January 14]], [[2014]].
In May [[2013]] a culvert collapsed on the road causing it to be shut down between [[Norrell Drive]] and [[Trussville-Clay Road]]. In September, the contract for construction was awarded to [[Bob Smith Construction]], with the engineering construction awarded to [[Schoel Engineering]]. Construction was completed by December and the road reopened on [[January 14]], [[2014]].

Revision as of 14:01, 26 March 2014

Green Drive is an approximately one-half mile road in Trussville and serves as a link from the business district near the Interstate 59 Chalkville Road exit to Trussville-Clay Road. The road leads north from Chalkville Road, then turns east just before intersecting the interstate. The entire eastern portion of the road is occupied by the Trussville Wastewater Treatment Plant and surrounding land owned by the Jefferson County Sewer System.

In May 2013 a culvert collapsed on the road causing it to be shut down between Norrell Drive and Trussville-Clay Road. In September, the contract for construction was awarded to Bob Smith Construction, with the engineering construction awarded to Schoel Engineering. Construction was completed by December and the road reopened on January 14, 2014.

Notable locations

References

  • Lloyd, Gary (December 30, 2013) "Green Drive construction complete; now waiting on paving." Trussville Tribune
  • Lloyd, Gary (January 15, 2014) "Green Drive reopens." Trussville Tribune