Glenbrook at Oxmoor Valley: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
'''Glenbrook at Oxmoor Valley''' is a proposed $50 million, 300-unit mixed-income residential development on a 26-acre parcel off [[Sydney Drive]] and [[Lakeshore Parkway]] in the [[Oxmoor Valley]].
'''Glenbrook at Oxmoor Valley''' is a $50 million, 300-unit mixed-income residential development on a 26-acre parcel off [[Sydney Drive]] and [[Lakeshore Parkway]] in the [[Oxmoor neighborhood|Oxmoor]] neighborhood.


The project is being developed by a partnership of [[Formation Methods LLC]] and Pennrose Properties of Pennsylvania.  The community was first planned for the area of [[Fountain Heights]] near the [[Civil Rights District]], but land acquisition proved too costly. The construction of 25 single family homes in Fountain Heights, however, is still planned as part of the overall project.
The project was developed by a partnership of [[Formation Methods LLC]] and Pennrose Properties of Pennsylvania.  The community was first planned for the area of [[Fountain Heights]] near the [[Civil Rights District]], but land acquisition proved too costly. The construction of 25 single family homes in Fountain Heights, however, is still planned as part of the overall project.


Phase I of 100 units was financed in part by a $7.4 million loan from the [[Housing Authority of the Birmingham District]], funded in turn by part of a $20 million HOPE VI grant from the United States Department of Housing and Urban Development. Wallace, Roberts & Todd of Philadelphia provided the architectural design and [[Capstone Building]] was general contractor. Construction on the first phase began in June [[2008]] and was completed in 12 months.
Phase I of 100 units was financed in part by a $7.4 million loan from the [[Housing Authority of the Birmingham District]], funded in turn by part of a $20 million HOPE VI grant from the United States Department of Housing and Urban Development. Wallace, Roberts & Todd of Philadelphia provided the architectural design and [[Capstone Building]] was general contractor. Construction on the first phase began in June [[2008]] and was completed in 12 months.


==References==
==References==
* Norris, Toraine (December 19, 2006) "Hope VI community now set for construction in Oxmoor Valley." ''Birmingham News''.
* Norris, Toraine (December 19, 2006) "Hope VI community now set for construction in Oxmoor Valley." {{BN}}
* Norris, Toraine (May 20, 2008) "Tuxedo Court project manager assures housing authority $20 million federal grant will be spent before September 2009 deadline." ''Birmingham News''
* Norris, Toraine (May 20, 2008) "Tuxedo Court project manager assures housing authority $20 million federal grant will be spent before September 2009 deadline." {{BN}}


==External links==
==External links==
* [http://www.habdsite.org/portfolio_item/glenbrook-at-oxmoor-valley/ Glenbrook at Oxmoor Valley] at HABDsite.org
* [http://www.capstonebuilding.com/PROJECTS/CURRENTPROJECTS/GlenbrookatOxmoorValleyPhaseI/tabid/114/Default.aspx Glenbrook at Oxmoor Valley] at capstonebuilding.com
* [http://www.capstonebuilding.com/PROJECTS/CURRENTPROJECTS/GlenbrookatOxmoorValleyPhaseI/tabid/114/Default.aspx Glenbrook at Oxmoor Valley] at capstonebuilding.com



Revision as of 14:37, 5 June 2016

Glenbrook at Oxmoor Valley is a $50 million, 300-unit mixed-income residential development on a 26-acre parcel off Sydney Drive and Lakeshore Parkway in the Oxmoor neighborhood.

The project was developed by a partnership of Formation Methods LLC and Pennrose Properties of Pennsylvania. The community was first planned for the area of Fountain Heights near the Civil Rights District, but land acquisition proved too costly. The construction of 25 single family homes in Fountain Heights, however, is still planned as part of the overall project.

Phase I of 100 units was financed in part by a $7.4 million loan from the Housing Authority of the Birmingham District, funded in turn by part of a $20 million HOPE VI grant from the United States Department of Housing and Urban Development. Wallace, Roberts & Todd of Philadelphia provided the architectural design and Capstone Building was general contractor. Construction on the first phase began in June 2008 and was completed in 12 months.

References

  • Norris, Toraine (December 19, 2006) "Hope VI community now set for construction in Oxmoor Valley." The Birmingham News
  • Norris, Toraine (May 20, 2008) "Tuxedo Court project manager assures housing authority $20 million federal grant will be spent before September 2009 deadline." The Birmingham News

External links