Green Drive: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
No edit summary
(Typo, route.)
Line 1: Line 1:
'''Green Drive''' is an approximately one-half mile road in [[Trussville]] and serves as a link from the business district near the [[Interstate 59]] [[Chalkville Road]] exit and [[Trussville-Clay Road]].
'''Green Drive''' is an approximately one-half mile road in [[Trussville]] and serves as a link from the business district near the [[Interstate 59]] [[Chalkville Road]] exit to [[Trussville-Clay Road]].  The road leads north from Chalkville Road, then turns east just before intersecting the interstate.


In May [[2013]] a culvert collapsed on the road causing it to be shut down between [[Norrell Drive]] and Trussville-Clay Road]]. Construction was completed by December and the road reopened in early [[2014]].
In May [[2013]] a culvert collapsed on the road causing it to be shut down between [[Norrell Drive]] and [[Trussville-Clay Road]]. Construction was completed by December and the road reopened in early [[2014]].


==Notable locations==
==Notable locations==
* Chalkville Road intersection (continues south as Pineview Road)
* [[Chalkville Road]] intersection (continues south as Pineview Road)
** Wendy's
** Wendy's
**6671: [[Trussville Dentistry]]
**6671: [[Trussville Dentistry]]
* Norrell Drive
* [[Norrell Drive]] intersection (west only)
** Trussville Water Treatment Plant
** Trussville Water Treatment Plant
* Trussville-Clay Road
* [[Trussville-Clay Road]] intersection (terminus)


==References==
==References==

Revision as of 11:24, 2 January 2014

Green Drive is an approximately one-half mile road in Trussville and serves as a link from the business district near the Interstate 59 Chalkville Road exit to Trussville-Clay Road. The road leads north from Chalkville Road, then turns east just before intersecting the interstate.

In May 2013 a culvert collapsed on the road causing it to be shut down between Norrell Drive and Trussville-Clay Road. Construction was completed by December and the road reopened in early 2014.

Notable locations

References

  • Lloyd, Gary (December 30, 2013) "Green Drive construction complete; now waiting on paving." Trussville Tribune