Iron Age Project: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
(Created page with "right|thumb|450px|Rendering of the Iron Age Project The '''Iron Age Project''' is a retail and office redevelopment of three adjoining buildings ...")
 
No edit summary
Line 6: Line 6:
Hatti relocated his company, [[CoreLinQ Innovations]] to the upper floor of the [[214-216 20th Street North]] building in early [[2016]]. He later purchased the vacant [[Iron Age Building]] next door and moved ahead with a concept of a shared hub for healthcare technology startups.
Hatti relocated his company, [[CoreLinQ Innovations]] to the upper floor of the [[214-216 20th Street North]] building in early [[2016]]. He later purchased the vacant [[Iron Age Building]] next door and moved ahead with a concept of a shared hub for healthcare technology startups.


Architect [[Randy Britton]] designed the renovations, and [[Robbie Dellinger]] was the general contractor.
Architect [[Randy Britton]] designed the renovations, and [[Robbie Dellinger]] was the general contractor. The completed project opened in January [[2019]].


==References==
==References==
Line 16: Line 16:


[[Category:Iron Age Project|*]]
[[Category:Iron Age Project|*]]
[[Category:2018 buildings]]
[[Category:2019 buildings]]
[[Category:Randy Britton buildings]]
[[Category:Randy Britton buildings]]

Revision as of 15:54, 20 September 2018

Rendering of the Iron Age Project

The Iron Age Project is a retail and office redevelopment of three adjoining buildings at 212-218 20th Street North in downtown Birmingham.

Harsha Hatti purchased the 218 20th Street North building in 2003 and renovated the ground floor for a restaurant tenant. Seafood D'Lite opened there in 2008, followed by Bistro 218 in 2012.

Hatti relocated his company, CoreLinQ Innovations to the upper floor of the 214-216 20th Street North building in early 2016. He later purchased the vacant Iron Age Building next door and moved ahead with a concept of a shared hub for healthcare technology startups.

Architect Randy Britton designed the renovations, and Robbie Dellinger was the general contractor. The completed project opened in January 2019.

References