Birmingham Fire Station No. 18: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
mNo edit summary
No edit summary
Line 7: Line 7:
The present station building was constructed in [[1961]]. In [[2009]] Mayor [[Larry Langford]] toured the station and immediately ordered a major refurbishing of it and 30 other stations.
The present station building was constructed in [[1961]]. In [[2009]] Mayor [[Larry Langford]] toured the station and immediately ordered a major refurbishing of it and 30 other stations.


On April 27, 2011, a tornado that tore its way from [[Tuscaloosa]] to [[Fultondale]] damaged the station on its way through Pratt City. The firemen are currently being housed in a FEMA facility until the station can be repaired or replaced.
On [[April 27]], [[2011]], a [[April 2011 tornado outbreak|tornado]] that tore its way from [[Tuscaloosa]] to [[Fultondale]] damaged the station on its way through Pratt City. The station was temporarily housed in a FEMA facility. Ground was broken for a new $2 million station on [[July 30]], [[2013]].


==Equipment==
==Equipment==
Line 13: Line 13:


==References==
==References==
* Gray, Jeremy (October 22, 2009) "Five-alarm fixer-uppers." ''Birmingham News''
* Gray, Jeremy (October 22, 2009) "Five-alarm fixer-uppers." '{{BN}}


==External links==
==External links==
Line 21: Line 21:
[[Category:Birmingham fire stations|18]]
[[Category:Birmingham fire stations|18]]
[[Category:1961 buildings]]
[[Category:1961 buildings]]
[[Category:April 2011 tornado outbreak]]
[[Category:2013 buildings]]
[[Category:Pratt City]]
[[Category:Pratt City]]

Revision as of 12:32, 30 July 2013

BirminghamFirestation18.jpg

Birmingham Fire Station No. 18 is located at 200 Dugan Avenue and serves Pratt City and the Daniel Payne area.

Kelly Ingram worked from Station No. 18 from 1908 until he re-enlisted in the Navy in 1912.

The present station building was constructed in 1961. In 2009 Mayor Larry Langford toured the station and immediately ordered a major refurbishing of it and 30 other stations.

On April 27, 2011, a tornado that tore its way from Tuscaloosa to Fultondale damaged the station on its way through Pratt City. The station was temporarily housed in a FEMA facility. Ground was broken for a new $2 million station on July 30, 2013.

Equipment

  • Engine 18

References

External links