Chapel Lane: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
{{Locate street | street=Chapel+Ln |zoom=16 |type=h}}
{{Locate street | street=Chapel+Ln |zoom=16 |type=h}}
'''Chapel Lane''' is an approximately one and a quarter-mile long northeast-southwest road in [[Hoover]] which connects [[Patton Chapel Road]] in the northwest to [[Galleria Boulevard]] in the southeast.
'''Chapel Lane''' is an approximately one and a quarter-mile long northeast-southwest road in [[Hoover]] which connects [[Patton Chapel Road]] in the northwest to [[Galleria Boulevard]] in the southeast.
In [[1976]], [[Hoover Fire Station No. 2]] was constructed near the Patton Chapel Road intersection. The original building was demolished in [[2007]], to realign the interstection. A new fire station was built on adjacent land.


Before [[2013]], Chapel Lane ended at [[Al Seier Road]], and was contained to the north side of [[Interstate 459]]. In the mid-1990s, an extension of the road was considered, to give access to the [[Galleria]]. The extension was part of the [[Galleria Boulevard flyover]] project, which created [[Galleria Boulevard]], which opened in [[2002]]. In [[2011]], construction on the $7.5 million second phase of the project began, and concluded in 2013. The three-quarter mile extension includes a 1,200-foot-long bridge beginning to the north of the [[Patton Creek Shopping Center]], over [[Patton Creek]] and under I-459.  
Before [[2013]], Chapel Lane ended at [[Al Seier Road]], and was contained to the north side of [[Interstate 459]]. In the mid-1990s, an extension of the road was considered, to give access to the [[Galleria]]. The extension was part of the [[Galleria Boulevard flyover]] project, which created [[Galleria Boulevard]], which opened in [[2002]]. In [[2011]], construction on the $7.5 million second phase of the project began, and concluded in 2013. The three-quarter mile extension includes a 1,200-foot-long bridge beginning to the north of the [[Patton Creek Shopping Center]], over [[Patton Creek]] and under I-459.  


==References==
==References==
* Batson, Roger, Jr (May 2, 2007) "New fire station opens off Patton Chapel Road."  {{BN}}
* Anderson, Jon (November 22, 2013) "Chapel Lane extension opens in Hoover, providing new route to Riverchase Galleria, Patton Creek, I-459." {{BN}}  
* Anderson, Jon (November 22, 2013) "Chapel Lane extension opens in Hoover, providing new route to Riverchase Galleria, Patton Creek, I-459." {{BN}}  


[[Category:Chapel Lane|*]]
[[Category:Chapel Lane|*]]

Revision as of 16:58, 13 January 2021

Locate with
Google Maps

Chapel Lane is an approximately one and a quarter-mile long northeast-southwest road in Hoover which connects Patton Chapel Road in the northwest to Galleria Boulevard in the southeast.

In 1976, Hoover Fire Station No. 2 was constructed near the Patton Chapel Road intersection. The original building was demolished in 2007, to realign the interstection. A new fire station was built on adjacent land.

Before 2013, Chapel Lane ended at Al Seier Road, and was contained to the north side of Interstate 459. In the mid-1990s, an extension of the road was considered, to give access to the Galleria. The extension was part of the Galleria Boulevard flyover project, which created Galleria Boulevard, which opened in 2002. In 2011, construction on the $7.5 million second phase of the project began, and concluded in 2013. The three-quarter mile extension includes a 1,200-foot-long bridge beginning to the north of the Patton Creek Shopping Center, over Patton Creek and under I-459.

References

  • Batson, Roger, Jr (May 2, 2007) "New fire station opens off Patton Chapel Road." The Birmingham News
  • Anderson, Jon (November 22, 2013) "Chapel Lane extension opens in Hoover, providing new route to Riverchase Galleria, Patton Creek, I-459." The Birmingham News