Eastwood Amazon Distribution Center: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
 
Line 8: Line 8:
* Thornton, William (July 21, 2020) "Birmingham takes steps on 2 big economic projects, 600 jobs projected." {{BN}}
* Thornton, William (July 21, 2020) "Birmingham takes steps on 2 big economic projects, 600 jobs projected." {{BN}}
* Van der Bijl, Hanno (November 3, 2020) "Atlanta developer acquires Century Plaza for $12M ahead of Amazon project." {{BBJ}}
* Van der Bijl, Hanno (November 3, 2020) "Atlanta developer acquires Century Plaza for $12M ahead of Amazon project." {{BBJ}}
* Bailey, Muriel (November 4, 2020) "New Amazon facility to bring jobs to Birmingham, Century Plaza to be demolished." ABC3340.com
* Thornton, William (November 12, 2020) "[https://www.al.com/business/2020/11/last-call-for-birminghams-century-plaza-as-demolition-begins.html Demolition begins for Birmingham’s Century Plaza, once Alabama’s largest mall]" {{BN}}
* Thornton, William (November 12, 2020) "[https://www.al.com/business/2020/11/last-call-for-birminghams-century-plaza-as-demolition-begins.html Demolition begins for Birmingham’s Century Plaza, once Alabama’s largest mall]" {{BN}}
* Thornton, William (January 4, 2021) "[https://www.al.com/business/2021/01/demolition-largely-completed-for-birminghams-century-plaza.html Demolition largely completed for Birmingham’s Century Plaza]" {{BN}}
* Thornton, William (January 4, 2021) "[https://www.al.com/business/2021/01/demolition-largely-completed-for-birminghams-century-plaza.html Demolition largely completed for Birmingham’s Century Plaza]" {{BN}}

Latest revision as of 13:19, 2 September 2021

The Eastwood Amazon Distribution Center (originally referred to as "Project Magic") is a 201,475 square-foot delivery station constructed for Amazon on the site of the former Century Plaza shopping mall, at the intersection of Crestwood Boulevard and Oporto-Madrid Boulevard in Eastwood. The facility replaced the North Birmingham Amazon Distribution Center at 2601 27th Street North.

The distribution center was developed by the "Century Plaza Co.", a subsidiary of the Stonemont Financial Group of Atlanta, Georgia, for an overall estimated cost of $60 million. They acquired the property from Lumpkin Development for $12 million. Brasfield & Gorrie won the $36,928,000 contract for construction. Demolition of the former mall began on November 12, 2020.