Highland Avenue overpass: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
(You Are Beutiful)
(+ Countdown clocks)
 
Line 1: Line 1:
[[Image:Highland Avenue overpass.jpg|thumb|right|375px|Southern portal in December 2009.]]
[[Image:Highland Avenue overpass.jpg|thumb|right|375px|Southern portal in December 2009.]]
The '''Highland Avenue overpass''' is the section of [[Highland Avenue]] which continues over the [[Elton B. Stephens Expressway]] ([[U. S. Highway 31]]) near [[23rd Street South]] and [[11th Avenue South]]. The expressway was tunneled below grade between the existing [[Highland Plaza]] and [[Highland Tower]] multistory apartment buildings.
The '''Highland Avenue overpass''' is the section of [[Highland Avenue]] which continues over the [[Elton B. Stephens Expressway]] ([[U. S. Highway 31]]) near [[23rd Street South]] and [[11th Avenue South]]. The expressway was tunneled below grade between the existing [[Highland Plaza Condominiums|Highland Plaza]] and [[Highland Towers]] multistory apartment buildings.


[[Harbert Construction]] used large earth-movers to reduce the time that the avenue would need to be closed by several months.  Begun on [[May 23]], [[1966]], the overpass was completed in January [[1967]].
[[Harbert Construction]] used large earth-movers to reduce the time that the avenue would need to be closed by several months.  Begun on [[May 23]], [[1966]], the overpass was completed in January [[1967]].
Line 7: Line 7:


[[Image:You Are Beautiful on bridge.jpg|thumb|left|200px|"You Are Beautiful"]]
[[Image:You Are Beautiful on bridge.jpg|thumb|left|200px|"You Are Beautiful"]]
In October [[2010]], the phrase "[[You Are Beautiful]]" was painted on the south side of the overpass, generating a great deal of reaction, much of it positive.  The message was later defaced, clumsily repainted, and finally painted over entirely in April [[2011]].  
In October [[2010]], the phrase "[[You Are Beautiful]]" was painted on the south side of the overpass, generating a great deal of reaction, much of it positive.  The message was later defaced, clumsily repainted, and finally painted over entirely in April [[2011]].
 
The southward facing side of the overpass has also served as the location of a pair of temporary countdown clocks.
 
* On [[March 8]], [[1995]], the [[Olympic soccer countdown clock]] was unveiled exactly 500 days prior to the opening ceremonies of the [[1996 Olympic soccer]] matches hosted at [[Legion Field]]. The clock was removed after the Olympics and subsequently auctioned off.
* On [[January 24]], [[2020]], the [[2022 World Games]] countdown clock was unveiled at [[Legion Field]] and subsequently installed on the overpass.


==References==
==References==
{{Locate | lat= 33.502732 | lon=-86.789459 | zoom=16 | type=h }}
{{Locate | lat= 33.502732 | lon=-86.789459 | zoom=16 | type=h }}
* "[http://bplonline.cdmhost.com/u?/p4017coll2,1193 Expressway Work To Close Highland]" (May 18, 1966) ''Birmingham Post-Herald'' - via Birmingham Public Library Digital Archives
* "[http://bplonline.cdmhost.com/u?/p4017coll2,1193 Expressway Work To Close Highland]" (May 18, 1966) ''Birmingham Post-Herald'' - via Birmingham Public Library Digital Archives
* Fussman, Chet (March 8, 1995) "[https://www.newspapers.com/clip/106890859/olympic-countdown-time/ Olympic countdown time]" ''Birmingham Post-Herald'' - via Newspapers.com
* Pratt, Ted (September 5, 1996) "Olympic yard sale offers field of mementos". ''Birmingham News''.
* WBRC Staff (January 24, 2020) "[https://www.wbrc.com/2020/01/24/countdown-clock-world-games-revealed-birmingham/ Countdown clock to World Games 2021 revealed in Birmingham]" - via [[WBRC]].com


[[Category:Highland Avenue]]
[[Category:Highland Avenue]]

Latest revision as of 16:24, 3 August 2022

Southern portal in December 2009.

The Highland Avenue overpass is the section of Highland Avenue which continues over the Elton B. Stephens Expressway (U. S. Highway 31) near 23rd Street South and 11th Avenue South. The expressway was tunneled below grade between the existing Highland Plaza and Highland Towers multistory apartment buildings.

Harbert Construction used large earth-movers to reduce the time that the avenue would need to be closed by several months. Begun on May 23, 1966, the overpass was completed in January 1967.

The approximately 287-foot long tunnel consists of cement walls on either side of the six-lane highway with square, cement columns bounded by metal safety railing separating the north- and southbound lanes. Illumination is provided by a series of lights along the tops of the walls and both sides of the central columns.

"You Are Beautiful"

In October 2010, the phrase "You Are Beautiful" was painted on the south side of the overpass, generating a great deal of reaction, much of it positive. The message was later defaced, clumsily repainted, and finally painted over entirely in April 2011.

The southward facing side of the overpass has also served as the location of a pair of temporary countdown clocks.

References

Locate with
Google Maps