I-20/59 downtown viaduct

From Bhamwiki
Revision as of 12:25, 26 February 2016 by Dystopos (talk | contribs)
Jump to navigation Jump to search

The I-59/20 downtown viaduct is an elevated section of Interstate 59/20 running east to west through downtown Birmingham from "Malfunction Junction" to 31st Street North. The 1.3 mile section was completed in 1971.

The downtown viaduct was designed to carry 80,000 cars per day. It was originally planned to be built over mounds of fill dirt brought downtown from the Red Mountain cut, but civic leaders eventually pushed for it to be left open underneath for parking. The Alabama Department of Transportation instructed the city that any changes made to its design, and the cost of any delays, would have to be paid for by the city.

In June 1964 the Downtown Improvement Association and Downtown Action Committee joined with the Birmingham City Council in passing resolutions asking Mayor Albert Boutwell to commission a feasibility and cost study for providing space for automobile parking underneath the four block area between 18th and 22nd Street adjoining the Civic Center and also under parts of the Red Mountain Expressway between 2nd and 6th Avenues North near the Birmingham Post Office. At the time it was anticipated that it would be possible to build a two-level parking structure below the interstates, providing as many as 1,360 spaces. Opposition to the proposal came from the operators of private parking lots.

Birmingham's 2003 City Center Master Plan introduced the idea of lowering the interstate into a below-grade cut through downtown and then decking over wide sections of the highway to provide pedestrian plazas connecting the municipal center with the BJCC.

In the 2000s the Department of Transportation proposed a bridge deck replacement project. That proposal was expanded into a viaduct replacement plan, with new, wider bridge decks spanning farther between larger, higher support posts. That scheme eliminates all left-lane exits and most other downtown access roads and proposes using pre-cast concrete deck sections rather than steel beams to reduce road noise. The first phase of preparatory work began in 2015. The second phase of the bridge replacement project was awarded to Granite Construction of Watsonville, California in February 2016.