BLOX: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 4: Line 4:


In [[2019]] BLOX announced an investment from the Jacksonville, Florida-based design and construction firm Haskell. In January [[2021]] the company secured another $40 million investment from ASH Ventures of Atlanta, Georgia.
In [[2019]] BLOX announced an investment from the Jacksonville, Florida-based design and construction firm Haskell. In January [[2021]] the company secured another $40 million investment from ASH Ventures of Atlanta, Georgia.
In [[2023]], the Helena, Montana, temple of the Church of Jesus Christ of Latter-day Saints was completed after being manufactured at BLOX's Bessemer facility. It is the first of a series of temples BLOX will manufacture for the church that will be erected around the world, including on small islands in the Pacific.


==References==
==References==
Line 10: Line 12:
* Patchen, Tyler (June 24, 2019) "BLOX scores investment from Florida company." {{BBJ}}
* Patchen, Tyler (June 24, 2019) "BLOX scores investment from Florida company." {{BBJ}}
* Thornton, William (February 1, 2021) "Bessemer’s BLOX gets $40 million investment. {{BN}}
* Thornton, William (February 1, 2021) "Bessemer’s BLOX gets $40 million investment. {{BN}}
* "[https://newsroom.churchofjesuschrist.org/article/helena-montana-temple-construction-process-modular-design-blox How the House of the Lord in Helena Was Built Differently: Modular construction is quicker and preserves quality]" (May 15, 2023) Church of Jesus Christ of Latter-day Saints News release.
* Bains, David (November 26, 2023) "[https://chasingchurches.com/2023/11/25/the-next-generation-of-mormon-temples-is-being-manufactured-in-bessemer-alabama/ The Next Generation of Mormon Temples is Being Manufactured in Bessemer, Alabama]." ''Chasing Churches''


==External links==
==External links==

Latest revision as of 07:47, 26 November 2023

BLOX is an integrated design-build company that manufactures large prefabricated components for buildings. It was founded in 2010 by Chris Giattina, as a spinoff from Giattina Aycock Architecture Studio. In 2014 the firm moved to a 50-acre site at the Interstate Industrial Park in Bessemer. BLOX currently employs 390 people. Its revenues for 2018 were $48.6 million.

BLOX describes its methodology as "DMC", for "design-manufacture-construct". The first major project to utilize BLOX's DMC components was Cardiovascular Associates clinic on Colonnade Parkway, completed in 2012. The company has specialized in patient rooms and restrooms for healthcare facilities, a manufacturing niche known as "modular medical pre-fab sub-assemblies", but has also delivered components for offices and other building types.

In 2019 BLOX announced an investment from the Jacksonville, Florida-based design and construction firm Haskell. In January 2021 the company secured another $40 million investment from ASH Ventures of Atlanta, Georgia.

In 2023, the Helena, Montana, temple of the Church of Jesus Christ of Latter-day Saints was completed after being manufactured at BLOX's Bessemer facility. It is the first of a series of temples BLOX will manufacture for the church that will be erected around the world, including on small islands in the Pacific.

References

External links