Bankhead Lock and Dam: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
No edit summary
 
(4 intermediate revisions by one other user not shown)
Line 1: Line 1:
The '''John Hollis Bankhead Lock and Dam''' is the northernmost impoundment structure, and the highest dam, on the mainstem of the [[Black Warrior River]]. It is located in the northeast corner of [[Tuscaloosa County]]. The original lock was built in [[1915]] and was replaced by the Army Corps of Engineers in [[1963]]. At that time, [[Alabama Power]] constructed a hydroelectric powerhouse below the lock. Bankhead is one of two Corps-owned dams fitted with an Alabama Power Company hydropower generating turbine.  The lock and dam created Bankhead Lake, which is the largest of the mainstem Warrior impoundments.
The '''John Hollis Bankhead Lock and Dam''' (also known as '''Lock 17''') is the northernmost impoundment structure, and the highest dam, on the mainstem of the [[Black Warrior River]]. It is named for U.S. Senator [[John Hollis Bankhead]], and is located in the northeast corner of [[Tuscaloosa County]].
 
The original lock was built by the U.S. Army Corps of Engineers in [[1915]], and was replaced in [[1963]]. At that time, [[Alabama Power]] constructed a hydroelectric powerhouse below the lock. Bankhead is one of two Corps-owned dams fitted with an Alabama Power Company hydropower generating turbine.  The lock and dam created [[Bankhead Lake]], which is the largest of the mainstem Warrior impoundments. The 1963 turbine was replaced in [[1997]], but stopped working in [[2015]].
 
In February [[2019]] Alabama Power invested $17 million to install a new American Hydro turbine, along with constructing a new control room and replacing headgates, stop-logs, wicket gates and other infrastructure.
 
==References==
* Nicholson, Gilbert (January 9, 2019) "Bankhead Lock and Dam getting makeover." ''Alabama Newscenter''


==External links==
==External links==
*[http://www.riversofalabama.org/Black%20Warrior/BW_Hydrologic_Modifications.htm Black Warrior Hydrologic Modifications] at Rivers of Alabama
*[http://www.riversofalabama.org/Black%20Warrior/BW_Hydrologic_Modifications.htm Black Warrior Hydrologic Modifications] at Rivers of Alabama
{{Black Warrior River}}


[[Category:Dams]]
[[Category:Dams]]
Line 8: Line 17:
[[Category:1915 buildings]]
[[Category:1915 buildings]]
[[Category:1963 buildings]]
[[Category:1963 buildings]]
[[Category:2019 buildings]]
[[Category:Alabama Power]]

Latest revision as of 18:28, 10 January 2019

The John Hollis Bankhead Lock and Dam (also known as Lock 17) is the northernmost impoundment structure, and the highest dam, on the mainstem of the Black Warrior River. It is named for U.S. Senator John Hollis Bankhead, and is located in the northeast corner of Tuscaloosa County.

The original lock was built by the U.S. Army Corps of Engineers in 1915, and was replaced in 1963. At that time, Alabama Power constructed a hydroelectric powerhouse below the lock. Bankhead is one of two Corps-owned dams fitted with an Alabama Power Company hydropower generating turbine. The lock and dam created Bankhead Lake, which is the largest of the mainstem Warrior impoundments. The 1963 turbine was replaced in 1997, but stopped working in 2015.

In February 2019 Alabama Power invested $17 million to install a new American Hydro turbine, along with constructing a new control room and replacing headgates, stop-logs, wicket gates and other infrastructure.

References

  • Nicholson, Gilbert (January 9, 2019) "Bankhead Lock and Dam getting makeover." Alabama Newscenter

External links

Black Warrior River
Dams

Bankhead Lock and Dam, Holt Lock and Dam, Oliver Lock and Dam, Lewis Smith Dam, Warrior Lock and Dam

Reservoirs

Bankhead Lake, Holt Lake, Lake Tuscaloosa, Lake Oliver, Smith Lake, Inland Lake, Highland Lake, Warrior Lake

Tributaries

Blackburn Fork, Locust Fork, Mulberry Fork, North River, Sipsey Fork, Valley Creek, Village Creek